english български
Home
Home
About Ecoproject
  • W W Treatment
  • Water treatment
  • Photovoltaic systems
  • Biogas installations
News
  • References
    • References
    • Industrial waste water treatment facilities
    • Domestic waste water treatment faculties
    • Municipal sites
    • Photovoltaic systems
  • Questionnaire
    • Industrial wastewater / Breeding farms
    • Domestic waste water
    • Water treatment / Potable water
    • Photovoltaic systems
  • Activities
  • Partners
  • Contact

Domestic waste water treatment faculties

1. WWTP for domestic waste water - Topas-5 in single family house for 4-7PE - Sofia.

Pre-design study, equipment supply, construction-mounting, supervision, installation and commissioning.







2. Working design and executed contract for fully completed waste water treatment plant of Elena Gri Group Holiday Village, Varna.

Pre-design study, equipment supply, construction-mounting, supervision, installation and commissioning.

The complex is situated on area of 100 dca and offers everything necessary for a good vacation Qmax/h=12m3/h




3. Working design and executed contract for fully completed WWTP of Golden Valley Holiday Village, Varna Qmax/h =10.5 m3/h

Pre-design study, equipment supply, construction-mounting, supervision, installation and commissioning.





4. Design, equipment supply, construction-mounting, supervision, installation and commissioning of waste water treatment plant in populated area near by Varna for 200PE. The plant capacity is 40m3/day.





5. Pre-design study, equipment supply, construction-mounting, supervision, installation and commissioning of WWTP for the village of Crystal Spa ApartHotel with capacity 2 500 PE.
 
© Copyright 2008-2009, Ecoproject | Sitemap